Blog - Cavitation and process intensification - p7

07/03/2017

Twin ROTOCAV ready to be installed in a biogas plant

Twin ROTOCAV ready to be installed in a biogas plant


Twin ROTOCAVs ready to be shipped to England! These hydrodynamic cavitators will be installed in a biogas plant, as a pre-treatment for the feedstock. Shorter fermentation times, increased production of methane, increased biomass yield and possibility to treat almost any kind of biomass, including fibrous biomasses: these are some of the advantages of our ROTOCAV cavitator!

facebooktwitterlinkedin